EV CHARGING
The Gujarat village is linking its solar infrastructure with local electric-vehicle charging.
WHAT CHANGED
An Oct 10 report says residents are adopting EVs and charging near the Sun Temple.
THE SYSTEM
MNRE's project record lists a 6 MW solar plant and a 15 MWh battery system.
DRIVER CHECKS
Check access, connector, operating hours and tariff before relying on a rural charging stop.
READ THE FULL STORY
See how to verify charging availability and compare the trip energy choice.
READ THE FULL STORY
Sources, numbers and what to watch next.
Tap up to read the full article ↑