Home › Shorts

NHAI to survey 500 Shimla homes before twin-tunnel work resumes

NHAI plans a condition survey of about 500 homes along Shimla’s Bhatta-Kufar–Chalaunthi twin tunnels before work resumes after…

Read: NHAI to survey 500 Shimla homes before twin-tunnel work resumes →

In this short

  • NHAI Plans Shimla Home Survey — NHAI plans a condition survey of homes above the twin-tunnel alignment before work resumes after reported…
  • Homes To Be Documented — Photographs and videography are planned to record existing building conditions before tunnelling restarts.
  • Tunnel Work Remains Halted — The reported survey follows resident complaints and an IIT review of possible causes of the cracks.
  • No New Toll Rule Reported — The update concerns construction safety and timing; the reports do not announce a toll or FASTag change.
  • What Drivers Should Watch — Follow the survey, repair plan and any official restart or traffic-management notice.
  • Get the full breakdown — Sources, numbers and what to watch next.

← All shorts