Ghazipur-Ballia highway to open 34 km for trial on 1 Oct

NHAI will open the first 34 km of the Ghazipur–Ballia greenfield NH-31 stretch for a trial run from 1 Oct, with fixed entry and…

Read: Ghazipur-Ballia highway to open 34 km for trial on 1 Oct →

In this short

  • FASTAG & TOLLS New Ghazipur-Ballia highway opens for trial NHAI is opening the first part of the greenfield NH-31 corridor, with fixed access points for drivers.
  • WHAT CHANGED Trial traffic starts on 1 October 1 Oct The initial operating section is scheduled to begin its trial run from this date.
  • THE NUMBER First stretch covers 34 kilometres 34 km The reported trial section runs from chainage 0 to 34.
  • DRIVER CHECK Use listed entry and exits The new road is a partial opening, so plan where you will leave and rejoin the existing network.
  • READ THE FULL STORY Plan your route before departure Check current signs, access arrangements and the road beyond the trial section before you leave.
  • READ THE FULL STORY Get the full breakdown Sources, numbers and what to watch next.

← All shorts