Most Used Tool

Toll Charges from Asansol to Tamluk

Calculate total trip cost with toll charges and fuel estimate. Compare route options, inspect toll-wise breakdown, and choose the best route for your journey.

Calculate Toll Charges

Select valid origin and destination from autocomplete suggestions to calculate accurately.

Searching locations...

Start typing and pick a result from the list.

Searching locations...

Choose a valid destination from suggestions.

Vehicle type affects toll and fuel estimation.

Tip: Press arrow keys and Enter to select autocomplete results quickly.

Estimated Total Trip Cost

₹2059.96

Fuel + minimum toll estimate for primary route.

Total Toll

₹560

2 routes available

Fuel Estimate

₹1499.96

272 km | 4 h 22 min

Grand Trunk Road

272 km | 4 h 22 min

Total Toll ₹560
Fuel ₹1499.96
Total Trip ₹2059.96
Toll Plazas 5

Per Toll Breakdown

  • Banskopa, NH-2, West Bengal

    ₹90
  • Palsit, NH-2, West Bengal

    ₹110
  • Dankuni, NH-2, West Bengal

    ₹110
  • Jaladhulagori (Dhulagarh), NH-16, West Bengal

    ₹135
  • Sonapetya, NH-41, West Bengal

    ₹115

Kolkata Kharagpur Highway

257 km | 5 h 17 min

Most economical
Total Toll ₹245
Fuel ₹1535.29
Total Trip ₹1780.29
Toll Plazas 3

Per Toll Breakdown

  • Mejia, NH-NH 60 (New NH 14), West Bengal

    ₹50
  • Debra, NH-16, West Bengal

    ₹80
  • Sonapetya, NH-41, West Bengal

    ₹115
Advertisement
🗺️ Plan this trip on a map — stops, food, fuel & EV charging along the way →

Plan your trip

Handpicked, not random — only stays and experiences we'd genuinely recommend. They're affiliate links, so we earn a small cut if you book, at no extra cost to you. Thanks for keeping Fuelprice free. How this works.

⚡ Electric vehicle trip

Charge cost (home)₹335
Charge cost (public DC)₹837
Energy needed41.8 kWh
Charging stops (~300 km range)0

Petrol fuel ≈ ₹1,500 vs EV on public charging ≈ ₹837 — save about ₹663 in energy on this trip.

Charging stations near your route

  • Electric Vehicle Charging Station
  • Electric vehicle charging station tata
  • Electric vehicle chargeing station
  • FC - Jio-BP - Khardaha 60 kW Khardaha
  • Charging station
  • TransEV Charging Station 60 kW Durgapur
  • FC - TataPower - TMSC Chandrani Enterprises 25 kW Asansol

Charging data © OpenStreetMap contributors & Open Charge Map. Charge-cost is indicative (efficiency ~6.5 km/kWh; adjustable).

Frequently Asked Questions

What is the toll charge from Asansol to Tamluk?

The estimated minimum toll from Asansol to Tamluk is ₹560 for a car on the primary route.

What is the road distance from Asansol to Tamluk?

The road distance from Asansol to Tamluk is about 272 km, roughly 4 h 22 min by car.

What is the estimated fuel cost from Asansol to Tamluk?

The estimated fuel cost from Asansol to Tamluk is about ₹1499.96 for a car.

How to use this calculator
  1. Type source and destination, then select from autocomplete results.
  2. Choose vehicle type based on your trip.
  3. Review total trip cost and per toll breakdown route-by-route.